Mangwerume dam

  • Mangwerume piped water scheme in ward 11 was successfully rehabilitated .
  • The borehole was rehabilitated into a piped water scheme with 12 solar powered stand pipes.
  • Initially the community and the school relied on a perennial borehole which was 5 km away
  • Now the scheme is serving 1 primary school and seven villages with a total of 1475 beneficiaries
  • Communities got aqua tabs to treat the dam water in a bid to increase the water available for consumption.

Info

Share